



What we did
- Steel lintel and new ceiling joists, then the door opening blocked up
- Floor, walls and ceiling insulated to Building Regulations
- New window where the garage door was
- Electrics, downlights and heating, then plastering, flooring and decorating
Every trade on these jobs was ours, so the client dealt with one team from the first visit to Building Control sign-off.
